Integrated city-scale Solid Waste Management (ISWM) complexes driving high-tonnage recovery, waste-to-energy generation and scientific dumpsite remediation.
Centralised facilities form the regional backbone of municipal solid waste infrastructure. Shrivanta designs, audits, engineers and operates city-scale integrated ISWM complexes across Bharat—anchored by 34+ facilities, statewide ISWM planning across all ULBs in Assam, a 10MW Waste-to-Energy plant in Gwalior, NTPC Waste-to-Carbonisation validation and legacy dumpsite bio-mining remediation in Ayodhya, Munger and Belagavi.
These industrial-scale campuses combine high-throughput automated Material Recovery Facilities (MRFs), Refuse-Derived Fuel (RDF) production lines, anaerobic bio-methanation, thermochemical reactors and engineered sanitary landfills with advanced reverse-osmosis leachate treatment systems.
Mega-Scale Mechanized MRF
Automated sorting lines with multi-stage trommels, ballistic separators and magnetic eddy-current sorters processing 500+ TPD.
Waste-to-Energy & RDF
High-calorific fraction preparation feeding grid-tied thermal gasification and power generation units (e.g. 10MW Gwalior WTE plant).
Bio-Mining Dumpsite Remediation
High-capacity mobile trommel trains and drone volumetric surveys restoring historic legacy dumpsites into reclaimed municipal greenfields.
ZLD Leachate RO Systems
Zero Liquid Discharge wastewater treatment integrating membrane bioreactors (MBR) and two-stage Reverse Osmosis for complete environmental safety.
| Technical Parameter | Engineering Standard |
|---|---|
| Throughput Capacity | 100 TPD to 2,500+ TPD regional centralized throughput |
| Integrated Processing Units | Automated MRF, RDF shredding line, Biomethanation / CBG plant, Bio-mining plant |
| Land Campus Footprint | 10 to 60+ Acres masterplanned industrial plots |
| Energy & Byproduct Output | Baseload electricity (up to 10MW), RDF for cement kilns, high-grade biochar, FCO city compost |
| Environmental Monitoring | 24/7 continuous ambient air & stack emission telemetry (CEMS) mapped to CPCB/SPCB |
| Flagship Precedents | Selected PSU clients: HSCL, NTPC and BBJ; flagship precedents include NTPC Waste-to-Carbonisation, Gwalior 10MW WTE, Assam statewide DPRs and Ayodhya SWM. |
- Metropolitan Corporations: Tier-1 and Tier-2 urban centers requiring end-to-end turnkey ISWM concessions.
- Multi-ULB Cluster Hubs: Regional waste treatment complexes built under AMRUT 2.0 and SBM (U) 2.0 frameworks.
- Legacy Dumpsite Remediation: Scientific bio-mining, inert capping and municipal prime land reclamation.
- Public Sector Partnerships: PSU and municipal joint ventures converting waste fractions into clean electrical power and CBG.
Build Regional ISWM Infrastructure
Consult with Shrivanta's senior project engineers, transaction advisors and DPR consultants to engineer centralized waste facilities.